in force 2026-05-29
02016R0424-20160331 → 02016R0424-20260529
Amended by Regulation (EU) 2024/2748 32024R2748
Regulation (EU) 2024/2748 of the European Parliament and of the Council of 9 October 2024 amending Regulations (EU) No 305/2011, (EU) 2016/424, (EU) 2016/425, (EU) 2016/426, (EU) 2023/988 and (EU) 2023/1230 as regards emergency procedures for the conformity assessment, presumption of conformity, adoption of common specifications and market surveillance due to an internal market emergency (Text with EEA relevance)
detected 2026-09-04
7 provisions touched — 7 substantive, 0 date-only, 6 disputed · 1 change without an explanation
Emendrix checks every change against three independent sources. Where they disagree it says so rather than picking a winner.
MODIFIED +702 −9 Art. 3 Definitions§
applies from: unknown (the text changed beyond its dates, so no date that moved can be read as the application date)
dates added to the text: 2024-10-09
The later version keeps point (27) on CE marking unchanged and adds two new definitions, point (28) for crisis-relevant goods and point (29) for internal market emergency mode.
Both new definitions are made by cross-reference to Regulation (EU) 2024/2747, with crisis-relevant goods tied to point (6) of Article 3 of that Regulation and internal market emergency mode tied to point (3) of Article 3 of that Regulation.
The earlier version contains no equivalent points (28) or (29) and ends its list of definitions at point (27).
Cited: Art. 3, v2 · Art. 3, v1
text before / after
02016R0424-20160331 → 02016R0424-20260529
Article 3
Definitions
For the purposes of this Regulation the following definitions apply:
(1) cableway installation means a whole on-site system, consisting of infrastructure and subsystems, which is designed, constructed, assembled and put into service with the objective of transporting persons, where the … 675 unchanged words … the conditions for the marketing of products;
(27) CE marking means a marking by which the manufacturer indicates that the subsystem or the safety component is in conformity with the applicable requirements set out in Union harmonisation legislation providing for its affixing. affixing;
(28) crisis-relevant goods means crisis-relevant goods as defined in Article 3, point (6), of Regulation (EU) 2024/2747 of the European Parliament and of the Council
Regulation (EU) 2024/2747 of the European Parliament and of the Council of 9 October 2024 establishing a framework of measures, related to an internal market emergency and to the resilience of the internal market and amending Council Regulation (EC) No 2679/98 (Internal Market Emergency and Resilience Act) (OJ L, 2024/2747, 8.11.2024, ELI: http://data.europa.eu/eli/reg/2024/2747/oj).;
(29) internal market emergency mode means internal market emergency mode as defined in Article 3, point (3), of Regulation (EU) 2024/2747.
INSERTED +1,274 −0 Art. 43a Application of emergency procedures§
applies from: unknown (an inserted provision states its own application date only in prose)
Sources disagree — the text comparison and the amending act's instructions found this change; the EU's own amendment metadata does not list it. All are shown; none is overruled.
This new article sets out the conditions under which Articles 43b to 43e apply, tying their operation to the Commission adopting an implementing act under Article 28 of Regulation (EU) 2024/2747, to subsystems and safety components designated as crisis-relevant goods under Article 18(4) of that Regulation, and to the activation of the internal market emergency mode under Article 18 of that Regulation.
It also states that Article 43c(7) continues to apply during the emergency mode and after its expiry or deactivation, and it empowers the Commission to adopt implementing acts on corrective or restrictive actions, procedures, and labelling and traceability requirements under Articles 43c and 43d, following the examination procedure in Article 44(3).
Cited: Art. 43a, v2
text before / after
inserted text (02016R0424-20260529)
Article 43a Application of emergency procedures 1. Articles 43b to 43e of this Regulation shall apply only if the Commission has adopted an implementing act pursuant to Article 28 of Regulation (EU) 2024/2747 with respect to subsystems and safety components covered by this Regulation. 2. Articles 43b to 43e of this Regulation shall apply only to subsystems and safety components which have been designated as crisis-relevant goods pursuant to Article 18(4) of Regulation (EU) 2024/2747. 3. Articles 43b to 43e of this Regulation shall apply only during the internal market emergency mode that has been activated in accordance with Article 18 of Regulation (EU) 2024/2747. However, Article 43c(7) of this Regulation shall apply during the internal market emergency mode and after its expiry or deactivation. 4. The Commission may adopt implementing acts regarding the corrective or restrictive actions to be taken, the procedures to be followed and the specific labelling and traceability requirements with respect to subsystems and safety components placed on the market or incorporated into a cableway installation in accordance with Articles 43c and 43d. Those implementing acts shall be adopted in accordance with the examination procedure referred to in Article 44(3).
INSERTED +1,178 −0 Art. 43b Prioritisation of the conformity assessment of subsystems and safety components designated as crisis-relevant goods§
applies from: unknown (an inserted provision states its own application date only in prose)
Sources disagree — the text comparison and the amending act's instructions found this change; the EU's own amendment metadata does not list it. All are shown; none is overruled.
This new article sets out rules for prioritising conformity assessment of subsystems and safety components designated as crisis-relevant goods, covering the scope of application, the obligation on notified bodies to prioritise applications, a limit on resulting costs to manufacturers, and an effort to increase testing capacity.
Cited: Art. 43b, v2
text before / after
inserted text (02016R0424-20260529)
Article 43b Prioritisation of the conformity assessment of subsystems and safety components designated as crisis-relevant goods 1. This Article applies to subsystems and safety components listed in the implementing act referred to in Article 43a(1) that are subject to the conformity assessment procedures referred to in Article 18 that require the mandatory involvement of a notified body. 2. The notified bodies shall make best efforts to process as a matter of priority all applications for a conformity assessment of subsystems and safety components referred to in paragraph 1 of this Article, irrespective of whether those applications have been lodged before or after the activation of the emergency procedures pursuant to Article 43a. 3. The prioritisation of applications for a conformity assessment of subsystems and safety components pursuant to paragraph 2 shall not result in additional disproportionate costs for the manufacturers who have lodged those applications. 4. The notified bodies shall make reasonable efforts to increase their testing capacities for subsystems and safety components referred to in paragraph 1 in respect of which they have been notified.
INSERTED +6,096 −0 Art. 43c Derogation from the conformity assessment procedures requiring the mandatory involvement of a notified body§
applies from: unknown (an inserted provision states its own application date only in prose)
Sources disagree — the text comparison and the amending act's instructions found this change; the EU's own amendment metadata does not list it. All are shown; none is overruled.
Article 43c is a newly inserted provision setting out a derogation from the conformity assessment procedures that normally require the mandatory involvement of a notified body, allowing a Member State to authorise placing on the market or incorporation of a specific subsystem or safety component on the basis of a duly justified request from an economic operator.
It also lays out the procedure for informing the Commission and other Member States, for the Commission to extend the authorisation's validity across the Union by implementing act, for urgent adoption of such acts, for the authorisation's territorial validity pending that act, for manufacturers' declarations of compliance, for the mandatory content of any authorisation including an end date tied to the internal market emergency mode, for exemption from CE marking, for market surveillance authorities' corrective powers, and for the non-effect of this procedure on the ordinary Article 18 conformity assessment procedures.
Cited: Art. 43c, v2
text before / after
inserted text (02016R0424-20260529)
Article 43c Derogation from the conformity assessment procedures requiring the mandatory involvement of a notified body 1. By way of derogation from Article 18, a Member State may authorise, on a duly justified request from an economic operator, the placing on the market or the incorporation into a cableway installation within the territory of that Member State, of a specific subsystem or safety component listed in the implementing act referred to in Article 43a(1) and for which the conformity assessment procedures referred to in Article 18 that require the mandatory involvement of a notified body have not been carried out but for which the compliance with all the applicable essential requirements laid down in Annex II has been demonstrated in accordance with procedures referred to in that authorisation. 2. The Member State shall immediately inform the Commission and the other Member States of any authorisation granted in accordance with paragraph 1 of this Article. Provided that the requirements set out in the authorisation ensure conformity with the applicable essential requirements laid down in Annex II, the Commission shall adopt, without delay, an implementing act extending the validity of the authorisation granted by a Member State in accordance with paragraph 1 of this Article to the territory of the whole Union and shall set out the conditions under which the specific subsystem or safety component may be placed on the market or incorporated into a cableway installation. When preparing the draft implementing act, the Commission may request national market surveillance authorities to provide relevant information or comments regarding the technical assessment that served as the basis for the authorisation referred to in paragraph 1 of this Article. The implementing act shall be adopted in accordance with the examination procedure referred to in Article 44(3). The subsystem or safety component subject to the extension of validity referred to in the first subparagraph shall bear the information that it is placed on the market as a crisis-relevant good. The implementing act referred to in the first subparagraph shall specify the content and presentation of that information. That information, as well as any labelling, shall be clear, understandable and intelligible and, where relevant, in a language which can be easily understood by consumers and other end-users, as determined by the Member State concerned. 3. On duly justified imperative grounds of urgency relating to the need to preserve the health and safety of persons, the Commission shall adopt immediately applicable implementing acts in accordance with the procedure referred to in Article 44(4). 4. As long as an implementing act as referred to in paragraph 2 or 3 is not adopted, the authorisation granted by a competent national authority in one Member State shall be valid only on the territory of that Member State, and on the territories of any other Member States whose competent national authorities have recognised the validity of that authorisation before the adoption of such an implementing act. Member States shall inform the Commission and the other Member States of any decision to recognise the validity of that authorisation. 5. Manufacturers of subsystems or safety components subject to the authorisation procedure referred to in paragraph 1 shall declare on their sole responsibility that the subsystem or safety component concerned complies with all the applicable essential requirements set out in Annex II and shall be responsible for the fulfilment of all the conformity assessment procedures indicated by the competent national authority. 6. Any authorisation issued pursuant to paragraph 1 shall set out the conditions and requirements under which the subsystem or safety component may be placed on the market or incorporated into a cableway installation. Such authorisations shall set out at least the following: (a) a description of the procedures, by means of which compliance with the applicable essential requirements set out in Annex II to this Regulation was successfully demonstrated; (b) any specific requirements regarding the traceability of the subsystem or safety component concerned; (c) an end date of validity of the authorisation, which cannot go beyond the last day of the period for which the internal market emergency mode has been activated in accordance with Article 18 of Regulation (EU) 2024/2747; (d) any specific requirements regarding the need to ensure a continuous conformity assessment with respect to the subsystem or safety component concerned; (e) measures to be taken upon expiry or deactivation of the internal market emergency mode with respect to the subsystem or safety component concerned that has been placed on the market or incorporated into a cableway installation. 7. By way of derogation from Articles 7, 20 and 21, subsystems or safety components for which an authorisation has been granted in accordance with paragraph 1 of this Article shall not bear the CE marking and Article 7 shall not apply. 8. The market surveillance authorities of a Member State, where an authorisation pursuant to paragraphs 1, 2 and 4 of this Article is valid shall be entitled, with respect to such subsystems or safety components, to take all corrective and restrictive actions at national level provided for under Regulation (EU) 2019/1020 of the European Parliament and of the Council Regulation (EU) 2019/1020 of the European Parliament and of the Council of 20 June 2019 on market surveillance and compliance of products and amending Directive 2004/42/EC and Regulations (EC) No 765/2008 and (EU) No 305/2011 (OJ L 169, 25.6.2019, p. 1). and under this Regulation. They shall immediately inform the Commission and the market surveillance authorities of all other Member States of these actions. 9. The use of the authorisation procedure set out in paragraphs 1 to 4 of this Article shall not affect the application on the territory of the Member State concerned of the relevant conformity assessment procedures laid down in Article 18.
INSERTED +4,575 −0 Art. 43d Presumption of conformity based on standards and common specifications§
applies from: unknown (an inserted provision states its own application date only in prose)
Sources disagree — the text comparison and the amending act's instructions found this change; the EU's own amendment metadata does not list it. All are shown; none is overruled.
A new Article 43d has been inserted, empowering the Commission to adopt implementing acts listing standards or establishing common specifications for subsystems and safety components designated as crisis-relevant goods, applicable where harmonised standards are unpublished or unavailable within a reasonable time, or where severe internal market disruptions restrict manufacturers' use of already-published harmonised standards.
The new article sets out how such implementing acts are adopted, how long they apply, the consultation steps preceding their preparation, the resulting presumption of conformity and its cessation after the internal market emergency mode ends, a derogation concerning goods already placed on the market, and a procedure for Member States to flag inadequacies in a listed standard or common specification.
Cited: Art. 43d, v2
text before / after
inserted text (02016R0424-20260529)
Article 43d Presumption of conformity based on standards and common specifications 1. Where subsystems and safety components have been designated as crisis-relevant goods, the Commission is empowered to adopt implementing acts, listing appropriate standards or establishing common specifications for such subsystems and safety components to cover the applicable essential requirements set out in Annex II to this Regulation in the following cases: (a) where a reference to harmonised standards covering the applicable essential requirements set out in Annex II to this Regulation has not been published in the Official Journal of the European Union in accordance with Regulation (EU) No 1025/2012 and no such reference is expected to be published within a reasonable period; or (b) where severe disruptions to the functioning of the internal market, which led to the activation of the internal market emergency mode in accordance with Article 18 of Regulation (EU) 2024/2747, significantly restrict the possibilities of manufacturers to make use of the harmonised standards that cover the applicable essential requirements set out in Annex II to this Regulation and the references of which have already been published in the Official Journal of the European Union in accordance with Regulation (EU) No 1025/2012. 2. The implementing acts referred to in paragraph 1 shall set out the most appropriate alternative technical solution for the purposes of providing a presumption of conformity in accordance with paragraph 5. To that end, references of European standards or references of relevant applicable national or international standards may be published in those implementing acts or, if there is no European standard or relevant applicable national or international standard, common specifications may be established by those implementing acts. 3. The implementing acts referred to in paragraph 1 of this Article shall be adopted in accordance with the examination procedure referred to in Article 44(3) and shall apply until the last day of the period during which the internal market emergency mode is activated, unless such implementing acts are amended or repealed in accordance with paragraph 7 of this Article. 4. Before preparing the draft implementing act referred to in paragraph 1 of this Article, the Commission shall inform the committee referred to in Article 22 of Regulation (EU) No 1025/2012 that it considers that the conditions in paragraph 1 of this Article have been fulfilled. When preparing that draft implementing act, the Commission shall take into account the views of relevant bodies or expert groups established under this Regulation and shall duly consult all relevant stakeholders. 5. Without prejudice to Article 17, subsystems and safety components that are in conformity with the standards or common specifications referred to in paragraph 1 of this Article, or parts thereof, shall be presumed to be in conformity with the applicable essential requirements set out in Annex II that are covered by those standards, common specifications or parts thereof. From the day following the expiry or deactivation of the internal market emergency mode, it shall no longer be possible for manufacturers to rely on the presumption of conformity provided by the standards or the common specifications referred to in the implementing acts referred to in paragraph 1 of this Article. 6. By way of derogation from Article 43a(3), first subparagraph, unless there is sufficient reason to believe that the subsystems or safety components, covered by the standards or common specifications referred to in paragraph 1 of this Article, present a risk to the health or safety of persons, the subsystems or safety components that are in conformity with those standards or common specifications and which have been placed on the market, shall be deemed to be in conformity with the applicable essential requirements set out in Annex II after the expiry or repeal of an implementing act adopted pursuant to paragraph 3 of this Article and after the expiry or deactivation of the internal market emergency mode. 7. When a Member State considers that a standard or common specification referred to in paragraph 1 does not entirely satisfy the applicable essential requirements set out in Annex II, it shall inform the Commission thereof by submitting a detailed explanation. The Commission shall assess that detailed explanation and may, if appropriate, amend or repeal the implementing act listing the standard or establishing the common specification in question.
INSERTED +1,002 −0 Art. 43e Prioritisation of market surveillance activities and mutual assistance among authorities§
applies from: unknown (an inserted provision states its own application date only in prose)
Sources disagree — the text comparison and the amending act's instructions found this change; the EU's own amendment metadata does not list it. All are shown; none is overruled.
This article is newly added and sets out that Member States are to prioritise market surveillance activities for the subsystems and safety components listed in the implementing act referred to in Article 43a(1), with the Commission facilitating coordination of that prioritisation through the Union Product Compliance Network.
It also provides that market surveillance authorities of the Member States are to make best efforts to assist other such authorities during an internal market emergency mode, including through mobilising expert teams or offering logistical support such as reinforcing testing capacity for the same listed subsystems and safety components.
Cited: Art. 43e, v2
text before / after
inserted text (02016R0424-20260529)
Article 43e Prioritisation of market surveillance activities and mutual assistance among authorities 1. Member States shall prioritise the market surveillance activities for subsystems and safety components listed in the implementing act referred to in Article 43a(1) of this Regulation. The Commission shall facilitate coordination of such prioritisation efforts through the Union Product Compliance Network established under Article 29 of Regulation (EU) 2019/1020. 2. The market surveillance authorities of the Member States shall ensure that best efforts are made to provide assistance to other market surveillance authorities during an internal market emergency mode, including by mobilising and dispatching expert teams to temporarily reinforce the staff of market surveillance authorities requesting assistance or by providing logistical support, such as the reinforcement of the testing capacity for subsystems and safety components listed in the implementing act referred to in Article 43a(1).
INSERTED ±0 CHA Va§
applies from: unknown
Sources disagree — the EU's own amendment metadata found this change; the text comparison finds no difference in the provision's text and the amending act's instructions do not mention it. All are shown; none is overruled.
No explanation shipped — the structural diff did not see this change, so it carries no text; another signal named the unit and the disagreement ships as `disputed`.
text before / after
No text on either side: this unit was named by a signal that carries no text, and only the structural diff carries any.
The full entry, with the citation mapping v1 = 02016R0424-20160331, v2 = 02016R0424-20260529, is committed at eu/32016R0424/CHANGELOG.md.